CASE COMMENTS : REGULATED-SECTORS – ENERGY – ELECTRICITY – NETWORK CONNECTION – NEW INTERCONNECTORS – FRENCH NRA
Electricity: The French NRA deals with access and connexion’s conditions to the public transport network for new interconnectors
*This article is an automatic translation of the original article, provided here for your convenience. Read the original article.
CRE, Deliberation of 9 May 2012 on the conditions for connection and access to the public transmission system of new interconnections referred to in Article 17 of Regulation (EC) No 714/2009 of 13 July 2009
Article 17 of Regulation 714/2009 of 13 July 2009 on conditions for access to the system for cross-border exchanges in electricity sets out the conditions under which a new interconnector may, upon request, be exempted for a limited period of time from some or all of the rules on third party access to the system, approval of tarification methodologies, unbundling of transmission systems and transmission system operators and the allocation of revenues
Access to this article is restricted to subscribers
Already Subscribed? Sign-in